Performance test

Each node is a box with a label. Open the grid, zoom and pan, then move the slider to change the node count from 100 to 3,000. Zoom should stay smooth at 2,500 nodes.

2,500

Stress test

Performance grid

2,500 nodes

Click or tap the grid to open it fullscreen. Zoom with the mouse wheel or a pinch, and drag to pan.